Vingroup 5 Star Hot Spring Project

A hot spring resort planned for Nha Trang Island, Vietnam to "heal people"

A Japanese style design was planned as the overall design concept.

Business content: Basic plan

業務実施年:2017年

view-12.png

Jakarta Islamic Hospital Reorganization and Construction Project

This was the master plan for Jakarta Islamic Hospital in Jakarta, Indonesia. Due to the deterioration of the existing facilities, we considered a reconstruction plan on the existing site to build a new hospital. The existing site had poor drainage and was surrounded by waterways, which caused flooding problems during the rainy season. The plan was to solve various problems by rebuilding the existing site and regenerate the facility into a new one.

Business content: Basic plan

Year of implementation: November 2021 to October 2022

Building size: 5 floors above ground, 1 floor below ground

Total floor area: Approximately 43,000 m2

Number of hospital beds: Planned number of hospital beds: 440

171012成都-5.jpg

Chengdu Cancer Center

中国と日本の先端医療開発プロジェクトの一環として中国成都市に500床のがんセンターの基本構想を行った。
段階的(3期に)に施工を行う計画。

Business content: Basic concept

Year of implementation: 2017

Building size: 9 floors above ground, 1 floor below ground

Total floor area: 40,620 m2

Number of beds: 500

画像1.png

Al Shatra General Hospital

イラク共和国保健省による総合病院建設工事をBIMを活用し日本から遠隔で工事監理を行っている。

Business content: Construction supervision

Project implementation year: 2022-2024

Building size: Hospital 2 floors, ward 5 floors, energy building 2 floors

Total floor area: 47,100㎡
(Hospital 18,600m2, Ward 25,000m2, Energy Building 3,500m2)

Number of beds: 200